Hi everybody!
We just finished migrating a client from Lilac to Ulmo — nine major
releases — while also moving them off a single-server self-hosted setup.
Upgrade window: one hour. Preparation: two months.
A few things that cost us the most time:
- You can’t skip releases (squashed migrations), so we built a minimal
Docker image per release from Koa onward just to runmigrate - Converting all tables to utf8mb4 was the single longest step
- Their Mongo was 500GB — almost entirely videos, sitting in GridFS,
because that’s where Studio’s course file uploads go - Post-Sumac forum migration needs
FORUM_MONGODB_DATABASEpatched back in - Teak’s Meilisearch reindex stalls init on a small instance
Wrote all of it up, including the Tutor plugins and the video extraction
process: https://aulasneo.com/blog/open-edx-migration-lessons-learned
Anyone else been through a jump this big? Curious what you hit — feedback welcome.